Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the learnpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the learnpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dc-bkash domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u744833385/domains/bizdatainsights.com/public_html/wp-includes/functions.php on line 6114
BSRM Announces Launch Of New $217 Million Steel Plant - BIZDATA INSIGHTS

BSRM Announces Launch of New $217 Million Steel Plant

Industry: Building Material, Steel
Company: BSRM Steels Limited
Company Intelligence Tag: Business Insights

BSRM is set to launch a new $108 million plant in Chattogram’s Mirsarai by late June or early July, aiming for an annual production capacity of 8 lakh tonnes to boost its local market share from 23% to 34%. The facility, nearing completion on 20 acres, will create approximately 1,000 jobs. Financing includes a $50 million loan from Jica for green industrialisation, alongside loans from Exim Bank, Standard Chartered Bank, and BRAC Bank. BSRM’s total production capacity will increase to 24 lakh tonnes with the new plant, which will also produce 150,000 tonnes of steel wires annually to reduce import dependence. Known for environmental initiatives, BSRM achieves zero emissions with Japanese APC systems, recycles water and slag waste, and plans to install 10MW of solar power. The company, operational since 1952, generated $1.691 billion revenue in 2022-23 and employs 5,000 directly and 25,000 indirectly. Bangladesh’s steel sector includes 55 re-rolling mills producing 70-75 lakh tonnes annually, with 60% used in government projects.

Source for more details:

Related News

Social Islami Bank Stands Strong with Clear Loan Records

November 21, 2024

Following the dissolution of its previous board on August 5, 2024, Social Islami Bank PLC, now led by an independent director and chairman, is undergoing significant reforms to address a liquidity crisis and restore stability. The Shariah-based lender has a total deposit of Tk 32,272.45 crore and investments of Tk 37,534.59 crore as of November 17, 2024

Moody’s Downgrades Deposit Ratings for Six Banks

November 21, 2024

Global rating agency Moody’s has downgraded the long-term local and foreign currency deposit ratings of BRAC Bank, Mercantile Bank, and Premier Bank due to Bangladesh's recent sovereign downgrade to B2 on November 18, 2023. This marks the first downgrade in 14 years, reflecting heightened economic risks.

Monno Ceramic Sees 89% Profit Drop in Q1

November 21, 2024

Monno Ceramic Industries Ltd, a prominent tableware manufacturer in Bangladesh, reported a steep 89% drop in profits for the first quarter (July-September) of FY 2024-25. The company’s earnings fell to Tk 30.17 lakh during this period, significantly lower than Tk 2.66 crore recorded in the same quarter of the previous year.

Doreen Power’s Profit Falls by 17%

November 21, 2024

Doreen Power Generations and Systems faced a profit drop of over 17% in Q1 FY 2024-25 due to plant shutdowns and rising operational costs. The company's profit for July-September stood at Tk 26.95 crore, down from Tk 32.52 crore a year earlier. Earnings per share (EPS) fell to Tk 1.48 from Tk 1.80, according to unaudited financial statements released on November 20, 2024.

Steel Industry Outlines 5-Point Plan to Tackle Issues

November 21, 2024

Bangladesh's steelmakers have presented a five-point demand to the interim government to alleviate challenges plaguing the industry. At a press briefing on November 18, the Bangladesh Steel Manufacturers Association (BSMA) urged for expedited infrastructure projects to mitigate the economic crisis affecting businesses.

117 Beximco-Linked BO Accounts Under Scrutiny

November 21, 2024

The Bangladesh Securities and Exchange Commission (BSEC) has frozen 117 beneficiary owner (BO) accounts allegedly linked to Beximco Ltd’s owners following a request from the Bangladesh Financial Intelligence Unit (BFIU). On November 14, the BSEC instructed the Chittagong Stock Exchange to gather KYC forms and portfolio statements of these accounts within three days.

Related News

Social Islami Bank Stands Strong with Clear Loan Records

November 21, 2024

Following the dissolution of its previous board on August 5, 2024, Social Islami Bank PLC, now led by an independent director and chairman, is undergoing significant reforms to address a liquidity crisis and restore stability. The Shariah-based lender has a total deposit of Tk 32,272.45 crore and investments of Tk 37,534.59 crore as of November 17, 2024

Moody’s Downgrades Deposit Ratings for Six Banks

November 21, 2024

Global rating agency Moody’s has downgraded the long-term local and foreign currency deposit ratings of BRAC Bank, Mercantile Bank, and Premier Bank due to Bangladesh's recent sovereign downgrade to B2 on November 18, 2023. This marks the first downgrade in 14 years, reflecting heightened economic risks.

Monno Ceramic Sees 89% Profit Drop in Q1

November 21, 2024

Monno Ceramic Industries Ltd, a prominent tableware manufacturer in Bangladesh, reported a steep 89% drop in profits for the first quarter (July-September) of FY 2024-25. The company’s earnings fell to Tk 30.17 lakh during this period, significantly lower than Tk 2.66 crore recorded in the same quarter of the previous year.

Doreen Power’s Profit Falls by 17%

November 21, 2024

Doreen Power Generations and Systems faced a profit drop of over 17% in Q1 FY 2024-25 due to plant shutdowns and rising operational costs. The company's profit for July-September stood at Tk 26.95 crore, down from Tk 32.52 crore a year earlier. Earnings per share (EPS) fell to Tk 1.48 from Tk 1.80, according to unaudited financial statements released on November 20, 2024.

Steel Industry Outlines 5-Point Plan to Tackle Issues

November 21, 2024

Bangladesh's steelmakers have presented a five-point demand to the interim government to alleviate challenges plaguing the industry. At a press briefing on November 18, the Bangladesh Steel Manufacturers Association (BSMA) urged for expedited infrastructure projects to mitigate the economic crisis affecting businesses.

117 Beximco-Linked BO Accounts Under Scrutiny

November 21, 2024

The Bangladesh Securities and Exchange Commission (BSEC) has frozen 117 beneficiary owner (BO) accounts allegedly linked to Beximco Ltd’s owners following a request from the Bangladesh Financial Intelligence Unit (BFIU). On November 14, the BSEC instructed the Chittagong Stock Exchange to gather KYC forms and portfolio statements of these accounts within three days.

BUSINESSMONITOR

Connect with


Dont Have Account? Please register Here